The Shams 400/132 kV substation delivered by Linxon, will integrate solar power from the Mohammed bin Rashid Al Maktoum (MBR) Solar Park into the Dubai electrical grid. As a main contractor Linxon will design, manufacture, install and commission the 400 kV & 132 kV Gas Insulated Switchgear (GIS) and all required power equipment.
Video: “A chapter in Shams project success story” – watch the video here!
July 14, 2020